Saturday 17 December 2016

Building Services

Project 1


Aims to develop an understanding of building services through the demonstration of appropriate service system in the building design by ourselves in Semester 2 Design Studio. Related drawings, diagrams, appropriate symbols and ubbl are required to develop ability to resolve issues related to specific building services system. These systems include:
i) electrical supply system
ii) cold water and hot water supply system
iii) sewerage and sanitary system
iv) drainage system


Project 2

This project aim to introduce basic principles and integrate various building systems through real life project. It also helps to gain basic understanding on the drawing conventions as well as standards for various building system. In a group of 6, we are to select a multi storey building with the following service system:

i. Mechanical Ventilation 
ii. Air-conditioning System 
iii. Active and Passive Fire Protection System 
iv. Mechanical Transportation System

A site visit to the selected building have given us an opportunity to have a hands on experience in exploring various building service in a building. We are required to carry out an analytical study and document all the findings, diagrams, literature reviews, as well as photos accordingly. UBBL are referred to justify if the selected building meets all the requirements stated.






No comments:

Post a Comment